Leamington Road Blackburn
Sewer Pre-Adoption Works
(Marland Builders)
3x Excavations to rectify faults on a sewer system for a new development in Blackburn so as to gain adoption by United Utilities.
Fryer Close, Penwortham
Sewer Pre-Adoption Works
(Progress Housing)
Culvet cleaning and de-silting of water course. Excavation and installation of Gabion cages. For pre-adoption by United Utilities.
Worden Park Flood Alleviation Scheme
(Environment Agency and South Ribble Borough Council)
After flooding on Parkgate drive, a joint venture between the Environment Agency and South Ribble Borough Council was entered into and we were instructed to excavate a flood basin on Worden Park to alleviate flooding problems on the surrounding estate during heavy rainfall.
Farington Lodge
Culvert Renewal & Tree Surgery
(South Ribble Borough Council and Lancashire County Council)
Installation of new 85metre x 450 millimetre plastic culvert to replace collapsed stone culvert and tree surgery.
New Longton Sports & Social Club
Practice Net Construction
Excavate and install dynamic sport base and matting for new practice nets.
St. Mary's Catholic High School
Culvert Repairs
(South Ribble Borough Council)
Excavation and repairs of root ingression to 600 millimetre concrete overflow culvert including all tree surgery.
Mr Potter (Leyland) New Driveway
Removal of concrete paving slabs and replaced with indian stone slabs to driveway.
Mr Jones (Bickerstaffe) Roof Project
Removal of 4 failed roof lights and installation of new velux®'s. Re-pointing of walls to barn conversion and roof repairs.
Mrs Reid (Leyland) Driveway, Front Garden & Rockery
Removal of old fence, block paved driveway and front lawn. New fence errected, indian stone dive laid and planters made of sleepers with decorative slate surround.



















